Terms
Terminology in eight languages
The table sets all 97 terms of ISO 21506:2024 side by side in eight languages: the English term of the standard and our editorial translations. Download it as CSV for spreadsheets or as TBX for terminology and translation tools.
Terms in eight languages
- CSV for spreadsheets (all 8 languages) CSV
- TBX for terminology and translation tools TBX
- Project glossary template (CSV, German and English) CSV
Free to use with attribution “iso21506.com” and a link.
| No. | Standard (en) | English | Deutsch | Español | Français | Português | Italiano | Polski | 日本語 |
|---|---|---|---|---|---|---|---|---|---|
| 3.1 | 100 % rule | 100 % rule | 100-Prozent-Regel | Regla del 100 % | Règle des 100 % | Regra dos 100% | Regola del 100 % | Reguła 100% | 100%ルール |
| 3.2 | activity | Activity | Vorgang | Actividad | Activité | Atividade | Attività | Działanie | アクティビティ |
| 3.3 | actual cost | Actual cost | Istkosten | Costo real | Coût réel | Custo real | Costo effettivo | Koszt rzeczywisty | 実コスト |
| 3.4 | baseline | Baseline | Basisplan | Línea base | Référence de base | Linha de base | Baseline | Plan bazowy | ベースライン |
| 3.5 | basis of estimate | Basis of estimate | Schätzgrundlage | Base de las estimaciones | Base d’estimation | Base das estimativas | Base delle stime | Podstawa szacowania | 見積りの根拠 |
| 3.6 | benefit | Benefit | Nutzen | Beneficio | Bénéfice | Benefício | Beneficio | Korzyść | ベネフィット |
| 3.7 | budget at completion | Budget at completion | Budget bei Fertigstellung | Presupuesto hasta la conclusión | Budget à l’achèvement | Orçamento no término | Budget al completamento | Budżet po zakończeniu | 完成時総予算 |
| 3.8 | business case | Business case | Business Case | Caso de negocio | Analyse de rentabilisation | Business case | Business case | Uzasadnienie biznesowe | ビジネスケース |
| 3.9 | change register | Change register | Änderungsregister | Registro de cambios | Registre des modifications | Registro de mudanças | Registro delle modifiche | Rejestr zmian | 変更登録簿 |
| 3.10 | change request | Change request | Änderungsantrag | Solicitud de cambio | Demande de modification | Solicitação de mudança | Richiesta di modifica | Wniosek o zmianę | 変更要求 |
| 3.11 | communication plan | Communication plan | Kommunikationsplan | Plan de comunicación | Plan de communication | Plano de comunicação | Piano di comunicazione | Plan komunikacji | コミュニケーション計画書 |
| 3.12 | configuration management | Configuration management | Konfigurationsmanagement | Gestión de la configuración | Gestion de configuration | Gerenciamento da configuração | Gestione della configurazione | Zarządzanie konfiguracją | 構成管理 |
| 3.13 | control | Control | Projektsteuerung | Control | Maîtrise | Controle | Controllo | Sterowanie | コントロール |
| 3.14 | control account | Control account | Control Account | Cuenta de control | Compte de contrôle | Conta de controle | Conto di controllo | Konto kontrolne | コントロールアカウント |
| 3.15 · 3.16 | corrective action | Corrective action | Korrekturmaßnahme | Acción correctiva | Action corrective | Ação corretiva | Azione correttiva | Działanie korygujące | 是正処置 |
| 3.17 | cost variance | Cost variance | Kostenabweichung | Variación del costo | Écart de coût | Variação de custos | Varianza dei costi | Odchylenie kosztów | コスト差異 |
| 3.18 | critical path | Critical path | Kritischer Pfad | Ruta crítica | Chemin critique | Caminho crítico | Percorso critico | Ścieżka krytyczna | クリティカルパス |
| 3.19 | decomposition | Decomposition | Zerlegung | Descomposición | Décomposition | Decomposição | Scomposizione | Dekompozycja | 要素分解 |
| 3.20 | deliverable | Deliverable | Liefergegenstand | Entregable | Livrable | Entrega | Deliverable | Produkt | 成果物 |
| 3.21 | earned value | Earned value | Fertigstellungswert | Valor ganado | Valeur acquise | Valor agregado | Valore guadagnato | Wartość wypracowana | アーンドバリュー |
| 3.22 | earned value management | Earned value management | Earned-Value-Analyse | Gestión del valor ganado | Management de la valeur acquise | Gerenciamento do valor agregado | Gestione del valore guadagnato | Zarządzanie wartością wypracowaną | アーンドバリューマネジメント |
| 3.23 | earned value management planning | Earned value management planning | Earned-Value-Management-Planung | Planificación de la gestión del valor ganado | Planification du management de la valeur acquise | Planejamento do gerenciamento do valor agregado | Pianificazione della gestione del valore guadagnato | Planowanie zarządzania wartością wypracowaną | アーンドバリューマネジメント計画 |
| 3.24 | earned value measurements | Earned value measurements | Earned-Value-Kennzahlen | Mediciones del valor ganado | Indicateurs de la valeur acquise | Medições de valor agregado | Misure del valore guadagnato | Wskaźniki wartości wypracowanej | アーンドバリュー指標 |
| 3.25 | estimate at completion | Estimate at completion | Schätzung bei Fertigstellung | Estimación a la conclusión | Estimation à l’achèvement | Estimativa no término | Stima al completamento | Szacunek po zakończeniu | 完成時総コスト見積り |
| 3.26 | estimate to complete | Estimate to complete | Schätzung bis zur Fertigstellung | Estimación hasta la conclusión | Estimation pour achèvement | Estimativa para terminar | Stima per il completamento | Szacunek do zakończenia | 残作業コスト見積り |
| 3.27 | governance | Governance | Governance | Gobernanza | Gouvernance | Governança | Governance | Nadzór | ガバナンス |
| 3.28 | governing body | Governing body | Leitungsorgan | Órgano de gobierno | Organe de gouvernance | Órgão de governança | Organo di governo | Organ nadzorczy | 統治機関 |
| 3.29 | hierarchical decomposition | Hierarchical decomposition | Hierarchische Zerlegung | Descomposición jerárquica | Décomposition hiérarchique | Decomposição hierárquica | Scomposizione gerarchica | Dekompozycja hierarchiczna | 階層的分解 |
| 3.30 | integrated baseline review | Integrated baseline review | Integrated Baseline Review | Revisión integrada de la línea base | Revue intégrée de la référence de base | Revisão integrada da linha de base | Riesame integrato della baseline | Zintegrowany przegląd planu bazowego | 統合ベースラインレビュー |
| 3.31 | issue | Issue | Offener Punkt | Incidente | Problème | Questão | Problematica | Zagadnienie | 課題 |
| 3.32 | issue register | Issue register | Offene-Punkte-Liste | Registro de incidentes | Registre des problèmes | Registro das questões | Registro delle problematiche | Rejestr zagadnień | 課題登録簿 |
| 3.33 | lead | Lead | Vorlaufzeit | Adelanto | Avance | Antecipação | Anticipo | Wyprzedzenie | リード |
| 3.34 | lessons learned | Lessons learned | Lessons Learned | Lecciones aprendidas | Leçons apprises | Lições aprendidas | Lezioni apprese | Wnioski z doświadczeń | 教訓 |
| 3.35 | management information system | Management information system | Managementinformationssystem | Sistema de información de gestión | Système d’information de gestion | Sistema de informações gerenciais | Sistema informativo di gestione | System informacji zarządczej | マネジメント情報システム |
| 3.36 | management reserve | Management reserve | Managementreserve | Reserva de gestión | Réserve de management | Reserva gerencial | Riserva di gestione | Rezerwa zarządcza | マネジメント予備 |
| 3.37 | milestone | Milestone | Meilenstein | Hito | Jalon | Marco | Milestone | Kamień milowy | マイルストーン |
| 3.38 | network schedule | Network schedule | Netzplan | Diagrama de red del cronograma | Réseau de l’échéancier | Diagrama de rede do cronograma | Reticolo della schedulazione | Harmonogram sieciowy | ネットワーク工程表 |
| 3.39 | opportunity | Opportunity | Chance | Oportunidad | Opportunité | Oportunidade | Opportunità | Szansa | 機会 |
| 3.40 | organizational breakdown structure | Organizational breakdown structure | Organisationsstrukturplan | Estructura de desglose de la organización | Structure de découpage de l’organisation | Estrutura analítica organizacional | Struttura di scomposizione dell’organizzazione | Organizacyjna struktura podziału | 組織ブレークダウンストラクチャー |
| 3.41 | outcome | Outcome | Outcome | Resultado | Résultat | Resultado | Esito | Rezultat | アウトカム |
| 3.42 | output | Output | Output | Salida | Extrant | Saída | Output | Wynik | アウトプット |
| 3.43 | parent element | Parent element | Übergeordnetes Element | Elemento padre | Élément parent | Elemento pai | Elemento padre | Element nadrzędny | 親要素 |
| 3.44 | performance measurement baseline | Performance measurement baseline | Performance Measurement Baseline | Línea base para la medición del desempeño | Référence de base pour la mesure de la performance | Linha de base de medição do desempenho | Baseline di misurazione delle prestazioni | Plan bazowy pomiaru wykonania | パフォーマンス測定ベースライン |
| 3.45 | planned value | Planned value | Planwert | Valor planificado | Valeur planifiée | Valor planejado | Valore pianificato | Wartość planowana | 計画価値 |
| 3.46 | portfolio | Portfolio | Portfolio | Portafolio | Portefeuille | Portfólio | Portafoglio | Portfel | ポートフォリオ |
| 3.47 | portfolio component | Portfolio component | Portfoliokomponente | Componente del portafolio | Composante de portefeuille | Componente do portfólio | Componente del portafoglio | Składnik portfela | ポートフォリオ構成要素 |
| 3.48 | portfolio management | Portfolio management | Portfoliomanagement | Gestión del portafolio | Management de portefeuille | Gerenciamento de portfólio | Gestione del portafoglio | Zarządzanie portfelem | ポートフォリオマネジメント |
| 3.49 | portfolio manager | Portfolio manager | Portfoliomanager | Director del portafolio | Gestionnaire de portefeuille | Gerente de portfólio | Responsabile del portafoglio | Kierownik portfela | ポートフォリオマネージャー |
| 3.50 | portfolio plan | Portfolio plan | Portfolioplan | Plan del portafolio | Plan de portefeuille | Plano do portfólio | Piano del portafoglio | Plan portfela | ポートフォリオ計画書 |
| 3.51 · 3.52 | preventive action | Preventive action | Vorbeugungsmaßnahme | Acción preventiva | Action préventive | Ação preventiva | Azione preventiva | Działanie zapobiegawcze | 予防処置 |
| 3.53 | product breakdown structure | Product breakdown structure | Produktstrukturplan | Estructura de desglose del producto | Structure de découpage du produit | Estrutura analítica do produto | Struttura di scomposizione del prodotto | Struktura podziału produktu | プロダクトブレークダウンストラクチャー |
| 3.54 | programme | Programme | Programm | Programa | Programme | Programa | Programma | Program | プログラム |
| 3.55 | programme benefit | Programme benefit | Programmnutzen | Beneficio del programa | Bénéfice du programme | Benefício do programa | Beneficio del programma | Korzyść z programu | プログラムベネフィット |
| 3.56 | programme component | Programme component | Programmkomponente | Componente del programa | Composante de programme | Componente do programa | Componente del programma | Składnik programu | プログラム構成要素 |
| 3.57 | programme management | Programme management | Programmmanagement | Gestión de programas | Management de programme | Gerenciamento de programas | Gestione del programma | Zarządzanie programem | プログラムマネジメント |
| 3.58 | programme manager | Programme manager | Programmmanager | Director del programa | Directeur de programme | Gerente de programa | Responsabile del programma | Kierownik programu | プログラムマネージャー |
| 3.59 | programme plan | Programme plan | Programmplan | Plan del programa | Plan de programme | Plano do programa | Piano del programma | Plan programu | プログラム計画書 |
| 3.60 | progress report | Progress report | Statusbericht | Informe de avance | Rapport d’avancement | Relatório de progresso | Rapporto di avanzamento | Raport z postępu | 進捗報告書 |
| 3.61 | project | Project | Projekt | Proyecto | Projet | Projeto | Progetto | Projekt | プロジェクト |
| 3.62 | project assurance | Project assurance | Projektsicherung | Aseguramiento del proyecto | Assurance projet | Garantia do projeto | Assurance del progetto | Zapewnienie projektu | プロジェクト保証 |
| 3.63 | project governance | Project governance | Projekt-Governance | Gobernanza del proyecto | Gouvernance de projet | Governança do projeto | Governance del progetto | Nadzór nad projektem | プロジェクトガバナンス |
| 3.64 | project life cycle | Project life cycle | Projektlebenszyklus | Ciclo de vida del proyecto | Cycle de vie du projet | Ciclo de vida do projeto | Ciclo di vita del progetto | Cykl życia projektu | プロジェクトライフサイクル |
| 3.65 | project management | Project management | Projektmanagement | Gestión de proyectos | Management de projet | Gerenciamento de projetos | Gestione dei progetti | Zarządzanie projektem | プロジェクトマネジメント |
| 3.66 | project management office | Project management office | Projektmanagementbüro | Oficina de gestión de proyectos | Bureau de management de projet | Escritório de gerenciamento de projetos | Ufficio di gestione dei progetti | Biuro zarządzania projektami | プロジェクトマネジメントオフィス |
| 3.67 | project manager | Project manager | Projektleitung | Director del proyecto | Chef de projet | Gerente de projeto | Project manager | Kierownik projektu | プロジェクトマネージャー |
| 3.68 | project plan | Project plan | Projektplan | Plan del proyecto | Plan de projet | Plano do projeto | Piano di progetto | Plan projektu | プロジェクト計画書 |
| 3.69 | project scope | Project scope | Projektumfang | Alcance del proyecto | Contenu du projet | Escopo do projeto | Ambito del progetto | Zakres projektu | プロジェクトスコープ |
| 3.70 | quality assurance | Quality assurance | Qualitätssicherung | Aseguramiento de la calidad | Assurance qualité | Garantia da qualidade | Assicurazione della qualità | Zapewnienie jakości | 品質保証 |
| 3.71 | quality control | Quality control | Qualitätslenkung | Control de la calidad | Maîtrise de la qualité | Controle da qualidade | Controllo della qualità | Kontrola jakości | 品質管理 |
| 3.72 | residual risk | Residual risk | Restrisiko | Riesgo residual | Risque résiduel | Risco residual | Rischio residuo | Ryzyko szczątkowe | 残存リスク |
| 3.73 | resource loading | Resource loading | Ressourcenbedarfsermittlung | Carga de recursos | Plan de charge des ressources | Carregamento de recursos | Carico delle risorse | Obciążenie zasobów | 資源負荷 |
| 3.74 | resource breakdown structure | Resource breakdown structure | Ressourcenstrukturplan | Estructura de desglose de recursos | Structure de découpage des ressources | Estrutura analítica dos recursos | Struttura di scomposizione delle risorse | Struktura podziału zasobów | 資源ブレークダウンストラクチャー |
| 3.75 | responsibility assignment matrix | Responsibility assignment matrix | Verantwortlichkeitsmatrix | Matriz de asignación de responsabilidades | Matrice d’attribution des responsabilités | Matriz de designação de responsabilidades | Matrice di assegnazione delle responsabilità | Macierz przypisania odpowiedzialności | 責任分担マトリックス |
| 3.76 | risk | Risk | Risiko | Riesgo | Risque | Risco | Rischio | Ryzyko | リスク |
| 3.77 | risk assurance | Risk assurance | Risk Assurance | Aseguramiento de riesgos | Assurance de la maîtrise des risques | Garantia de riscos | Assurance dei rischi | Zapewnienie w zakresie ryzyka | リスク保証 |
| 3.78 | risk breakdown structure | Risk breakdown structure | Risikostrukturplan | Estructura de desglose de riesgos | Structure de découpage des risques | Estrutura analítica dos riscos | Struttura di scomposizione dei rischi | Struktura podziału ryzyka | リスクブレークダウンストラクチャー |
| 3.79 | risk contingency reserve | Risk contingency reserve | Risikoreserve | Reserva para contingencias de riesgos | Réserve pour risques | Reserva de contingência para riscos | Riserva di contingenza per i rischi | Rezerwa na ryzyko | リスクコンティンジェンシー予備 |
| 3.80 | risk response | Risk response | Risikobewältigung | Respuesta al riesgo | Réponse aux risques | Resposta a riscos | Risposta ai rischi | Reakcja na ryzyko | リスク対応 |
| 3.81 | risk tolerance | Risk tolerance | Risikotoleranz | Tolerancia al riesgo | Tolérance au risque | Tolerância a riscos | Tolleranza al rischio | Tolerancja ryzyka | リスク許容度 |
| 3.82 | rolling wave planning | Rolling wave planning | Rollierende Planung | Planificación gradual | Planification par vagues successives | Planejamento em ondas sucessivas | Pianificazione a finestra mobile | Planowanie kroczące | ローリングウェーブ計画法 |
| 3.83 | schedule buffer | Schedule buffer | Terminpuffer | Colchón del cronograma | Tampon d’échéancier | Pulmão do cronograma | Buffer della schedulazione | Bufor harmonogramu | スケジュールバッファー |
| 3.84 | schedule performance index | Schedule performance index | Terminleistungsindex | Índice de desempeño del cronograma | Indice de performance des délais | Índice de desempenho de prazos | Indice di performance della schedulazione | Wskaźnik wykonania harmonogramu | スケジュール効率指数 |
| 3.85 | sponsor | Sponsor | Projektsponsor | Patrocinador | Commanditaire | Patrocinador | Sponsor | Sponsor | スポンサー |
| 3.86 | stakeholder | Stakeholder | Stakeholder | Interesado | Partie prenante | Parte interessada | Stakeholder | Interesariusz | ステークホルダー |
| 3.87 | strategic alignment | Strategic alignment | Strategische Ausrichtung | Alineación estratégica | Alignement stratégique | Alinhamento estratégico | Allineamento strategico | Dostosowanie strategiczne | 戦略的整合 |
| 3.88 | task order | Task order | Abrufauftrag | Orden de tarea | Bon de commande | Ordem de serviço | Ordine di servizio | Zlecenie zadania | タスクオーダー |
| 3.89 | technical performance | Technical performance | Technische Leistung | Desempeño técnico | Performance technique | Desempenho técnico | Prestazione tecnica | Wykonanie techniczne | 技術的パフォーマンス |
| 3.90 | threat | Threat | Bedrohung | Amenaza | Menace | Ameaça | Minaccia | Zagrożenie | 脅威 |
| 3.91 | time-phased budget | Time-phased budget | Zeitlich verteiltes Budget | Presupuesto distribuido en el tiempo | Budget échelonné dans le temps | Orçamento distribuído no tempo | Budget distribuito nel tempo | Budżet rozłożony w czasie | 時系列予算 |
| 3.92 | undistributed budget | Undistributed budget | Nicht verteiltes Budget | Presupuesto no distribuido | Budget non réparti | Orçamento não distribuído | Budget non distribuito | Budżet nierozdzielony | 未配分予算 |
| 3.93 | variance | Variance | Abweichung | Variación | Écart | Variação | Varianza | Odchylenie | 差異 |
| 3.94 | variance at completion | Variance at completion | Abweichung bei Fertigstellung | Variación a la conclusión | Écart à l’achèvement | Variação no término | Varianza al completamento | Odchylenie po zakończeniu | 完成時差異 |
| 3.95 | variance threshold | Variance threshold | Abweichungsschwelle | Umbral de variación | Seuil d’écart | Limite de variação | Soglia di varianza | Próg odchylenia | 差異のしきい値 |
| 3.96 | work breakdown structure | Work breakdown structure | Projektstrukturplan | Estructura de desglose del trabajo | Structure de découpage du projet | Estrutura analítica do projeto | Struttura di scomposizione del lavoro | Struktura podziału pracy | ワークブレークダウンストラクチャー |
| 3.97 | work breakdown structure dictionary | Work breakdown structure dictionary | PSP-Verzeichnis | Diccionario de la EDT | Dictionnaire de la SDP | Dicionário da EAP | Dizionario della WBS | Słownik WBS | WBS辞書 |
| 3.98 | work breakdown structure element | Work breakdown structure element | PSP-Element | Elemento de la EDT | Élément de la SDP | Elemento da EAP | Elemento della WBS | Element WBS | WBS要素 |
| 3.99 · 3.100 | work package | Work package | Arbeitspaket | Paquete de trabajo | Lot de travaux | Pacote de trabalho | Pacchetto di lavoro | Pakiet roboczy | ワークパッケージ |
Notes
- The standard is published in English and French. All other terms, including our French ones, are editorial translations from the PMDecoder glossary, not official versions.
- The project glossary template contains our German short explanation for each term and empty columns for the meaning in your organization, deviations and owners.
- When passing it on, please credit iso21506.com and link to this page.