FAQ
Frequently asked questions about ISO 21506
The most important questions about ISO 21506, answered briefly. The page on the standard explains it in more detail, and the individual terms are in the list of terms.
Questions and answers
What is ISO 21506?
ISO 21506 is the vocabulary standard of the ISO 21500 series. It defines what the technical terms of project, programme and portfolio management mean in these standards. The current edition is ISO 21506:2024.
How many terms does ISO 21506:2024 contain?
Clause 3 contains 100 entries (3.1 to 3.100). Because three terms are each defined twice for different contexts, there are 97 distinct terms. All of them are in the list of terms.
What has changed since ISO/TR 21506:2018?
The 2018 edition was a Technical Report with 90 definitions; the 2024 edition is an International Standard with 100 entries. The terms were aligned with ISO 9000:2015 and with the revised standards of the series. Details are on the page on the standard.
Which languages is ISO 21506 available in?
ISO 21506 is published in English and French; in Germany, DIN Media sells the original version. Unlike ISO 21500 and ISO 21502, there is so far no adoption as DIN ISO with a German translation. The German and Spanish terms on the other language versions of this site are editorial translations, not official versions.
Can you be certified against ISO 21506?
No. ISO 21506 is a vocabulary standard and contains no requirements against which certification would be possible. The other standards in the series are also guidance standards. A requirements standard, ISO 21514, is in development. Individuals can nevertheless demonstrate their knowledge of the ISO 21500 series, for example with a certificate from a German Chamber of Industry and Commerce (IHK) after a course; offerings are available at iso21500.de (mostly in German).
How does ISO 21506 relate to ISO 21500 and ISO 21502?
ISO 21500 describes the overarching framework, and ISO 21502 gives guidance on project management. Both use the terms defined in ISO 21506. The page on the ISO 21500 series gives an overview.
Do the terms match the PMBOK Guide and PRINCE2?
Largely, but not completely. Many terms have equivalents with the same meaning; some have different names or are defined more narrowly or more broadly. The concordance shows the equivalents in detail.
May I use the definitions from the standard?
The text of the standard is protected by copyright. Reproducing it word for word in your own documents requires permission from ISO or the national standards body. Referring to the standard by edition and clause number is permitted.
Who operates this site?
iso21506.com is an independent information service provided by iso21500.de and is not affiliated with ISO. Details of the provider are in the legal notice.